BCA Part 3.12 Energy Efficiency - Assessment & Reporting - Design-Drafting - In-House
Current at: 22 February 2010 (A)
WHY OFFER THIS WORKSHOP?
- BCA 2010 Part 3.12 Energy Efficiency has a WA Variation referencing the BCA 2009 Energy Efficiency provisions.
- Local Government Building Surveyors are asking for the 2009 Glazing Calculator Add-Ons Common Practice Solution to be used for compliance reporting.
- BCA 2009 Energy amendments change the way parts of the assessment are done.
- 5-Star Plus reporting can now be done without the need for a separate report.
- Technical support calls suggest Borrowed Ventilation is not well understood and that it’s possible to solve ventilation issues in a more affordable way.
WHAT WILL PARTICIPANTS LEARN?
After this session participants will be able to:
- Use the updated Glazing Calculator Add-Ons worksheet for compliance assessment.
- Assess borrowed ventilation and use the Air Movement Datasheet to report compliance.
- Use the Ceiling Insulation Area Common Practice Interpretation to assess the ceiling insulation area loss, use the Ceiling Insulation Datasheet to calculate the area of insulation lost when recess lights and exhaust fans are installed and report the adjusted Minimum Added (Roof) Insulation required.
- Use the Roof Light Datasheet to assess a roof light, use the Roof Light Common Practice Solution to verify its thermal performance and report compliance.
- Assess any extra-over increase to the Added Insulation R-value that occurs when wall and/or roof cavities are filled with insulation.
- Use the updated Compliance Report for 5-Star Plus (WA Additions) Reporting.
WORKSHOP LEADER
James Bertram established the As-Built Learning Exchange (ABLE) to provide compliance and workmanship support for people working in the WA building industry.
He developed the Glazing Calculator Add-Ons and in 2009 was engaged by Building Commission to review the draft BCA2010 6-Star provisions.
LEARNING PHILOSOPHY
ABLE Workshops are designed to develop “communities-of-practice” where individuals with similar roles and responsibilities share their experiences and learn from each other.
ACTIVITIES
This Workshop is run in-your-workplace so that participants can experience using the updated tools to assess one of their current building projects.
A brief overview of BCA2009 Energy amendments will be provided then participants will:
- Discuss options for solving Borrowed Ventilation, assess a plan, and report the outcome.
- Assess ceiling insulation area loss and report any change in Added Insulation R-value.
- Assess and report a Roof Light.
- Complete the revised Compliance Report.
- Participants will have the opportunity to find answers to their work specific issues.
Booking Details
Click the link below to download the Workshop Information sheet.
New User Registration or Login Required
To download the file assessment-and-reporting-design-drafting-house.pdf you need to login to the As-Built Learning Exchange. If you do not have login details, you will need to register as a new user.
