Amendment Register
How to Suggest An Amendment or Improvement
How You Know Material Has Been Updated
Why Material Is Amended
The Building Code of Australia (BCA) is amended every year, Australian Standards, Manufacturer Directions and the like change over time, errors in existing material can be discovered, and new issues continually emerge.
Building Professionals must familiarise themselves with relevant Codes and Directions and currently published ABLE material to ensure the material they are using is currently applicable.
Once published, Local Practice Resources are only amended if:
- Subsequent BCA amendments do not affect the material, or
- Local Practice Project support and resources are in place to undertake the required research, obtain expert evidence and/or update the material content, or
- Editorial changes/improvements are made that do not affect the technical content.
How To Suggest An Amendment or Improvement
In a community of practice people learn how to work smarter by exchanging their working experiences with others.
Whether you’re a designer or draftsperson, estimator or scheduler, contract administrator, construction manager, supervisor, tradesperson, supplier or contractor you are a Building Professional who belongs to the industry community and are part of a community of individuals that do what you do.
If you find an error in ABLE material, if you have suggestion for a better way to describe an issue, or if you have a recently made a “watch out for this” discovery, why not share it with ABLE.
Call Mobile 0412 010 939 or click Contact ABLE in the grey sidebar to send an email.
ABLE will do any leg work that is required, and thank you for your contribution.
How You Know Material Has Been Updated
Local Practice Resources have a “currency” tag that is typically shown at the top of the page. This tag has three parts:
- Published (Date) – this identifies the when the material was first published.
- Amendment (No.) – this identifies changes that have been made to published material. These changes can range from editorial corrections through to technical content changes required to update the material for subsequent BCA versions.
- BCA (Year) – this identifies the BCA version that applies for the material. If the year does not match the current BCA version, then the material has not been updated and cannot be used to verify compliance.
“Currency” tags should be interpreted as follows:
Amendment Register
When an amendment is made to a published Local Practice Resource, a brief description of the change is listed under the resource title.
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
A
Addenda Document Template
16 May 2010 (A) - formating changes
27 May 2010 (B) - Project and D&C version merged into common format
10 October 2010 (D) - conditions of use amended
As-Built Outcomes Document Schedule
16 May 2010 (A) - formating changed
27 May 2010 (A) - formating changed
28 July 2010 (E) - significant restructuring of document
10 October 2010 (F) - conditions of use amended
Aircraft Noise in the Vacinity of Perth Airport Local Practice Solution
Amendments 1-6 - editorial changes
Amendment 7 / 01 June 2011 - editorial changes
B
Bath-Wall Junction Local Practice Solution
Amendment 1 / 30 May 2011 - BCA currency confirmed
C
Ceiling Insulation Area Local Practice Interpretation
Amendment 1 / 16 May 2010 / editorial changes
Amendment 2 / 10 October 2010 - conditions of use amended
Amendment 3 / 01 June 2011 - BCA 2011 currency confirmed
Amendment 4 / 09 June 2011 - Under heading "How is compliance interpreted", wording for BCA 3.12.1.2 - Roof - sub-clause (c) changed from "...exhaust fans and recessed lights" to "exhaust fans, flues or recessed lights" as per amendment to BCA 2010.
Amendment 5 / 16 June 2011 - Under heading "How is compliance interpreted", wording after Table 3.12.1.1b change from "..specifies the “additional percentage of the minimum added insulation required” for the “percentage of reduced ceiling insulation of the Building” to "...specifies the adjusted R-Value of ceiling insulation required for any nominated penetration area percentage".
Amendment 6 / 30 July 2011 - National Construction Code referenced.
Compliance Report & Pre-Start Calculator (Excel 2003) Local Practice Interpretation
Amendment 1 / 6 Sept 2011 - Compliance Report: data corrections to background formula, Class 10 buildings added to "Vented" fittings question. Pre-Start Calculator: error messages added if Zero ceiling penetration and "vented" light fitting option selected.
Compliance Report & Pre-Start Calculator (Excel 2007) Local Practice Interpretation
Amendment 1 / 6 Sept 2011 - Compliance Report: data corrections to background formula, Class 10 buildings added to "Vented" fittings question. Pre-Start Calculator: error messages added if Zero ceiling penetration and "vented" light fitting option selected.
Construction Based Performance Gain
Amendments 1-3 - data corrections
Amendment 4 / 14 April 2011 - editorial changes
D
Design & Drafting Work Practice Document Template
07 March 2010 (A) - page layouts restructured
16 May 2010 (B) - formating changes
27 May 2010 (C) - formating changes
10 October 2010 (E) - conditions of use amended
Design Based Performance Gain
Amendment 1 / 14 April 2011 - editorial changes
E
Estimating & Scheduling Work Practice Document Template
16 May 2010 (A) - formating changes
27 May 2010 (B) - formatting changes
10 October 2010 (D) - conditions of use amended
F
G
Glazing Calculator Add-Ons Local Practice Solution
Amendment 1 / 01 May 09 - Excel file worksheet - Air Movement Datasheet amended to include Cyclone Cat D option, Ceiling Insulation Penetration Datasheet added, Roof Light Datasheet added, Compliance Report amended to include BCA2009 amendments and WA Additions (5-Star Plus).
Amendment 2 / 06 October 09 - Excel file worksheet - Ceiling Insulation Penetration Datasheet amended to reflect only one total area (ref: Ceiling Insulation Area Common Practice Interpretation).
Amendment 3 / 30 May 2011 - editorial changes and conditions of use amended
Glazing Calculator Add-Ons for EXCEL 2007 Local Practice Solution
Amendment 1 / 30 May 2011 - editorial changes and conditions of use amended
H
I
J
K
L
Local Practice Snapshot - BCA 2010 6-Star Public Comment Draft
Amendment 1 / 04 October 2010 - editorial amendments
M
Masonry Trade Work Practice Document Template
16 May 2010 (A) - formating changes
27 May 2010 (A) - formatting changes
10 October 2010 (D) - conditions of use amended
N
NatHERS Climate Zone Boundaries
Amendement 1 / 14 April 2011 - editorial changes
O
P
Purchase Order Document Template
10 October 2010 (A) - condition of use amended
Process and Costruction Cost
Amendment 1 / 04 April 2011 - editorial changes
Project Outline: 6-Star - Planning for Better Outcomes
Amendment 1 / 04 April 2011 - editorial changes
Project Explanation: Reporting Modelling-DTS Compliance
Amendment 1 / 10 June 2011 - Project Contributor Invitation amended to explain that smaller entities can co-contribute to the project.
Q
R
Roof Light Local Practice Solution
Amendment 1 / 16 May 2010 - formating changes
Amendment 2 / 10 October 2010 - conditions of use amended
Amendment 3 / 30 May 2011 - editorial changes
Roof Carpentry Trade Work Practice Description
10 October 2010 (A) - conditions of use amended
S
Specification Document Template (New Buildings)
16 May 2010 (A) - formating changes
27 May 2010 (B) - signifiicant changes to clause content throughout document
16 July 2010 (E) - significant restructuring of the document
10 October 2010 (F) - conditions of use amended
6-Star - DTS or Modelling
Amendment 1 / October 2010 - editorial changes
Amendment 2 / 01 June 2011 - editorial changes
6-Star - DTS or Modelling - Outcomes in Brief
Amendment 1 / 01 June 2011 - editorial changes
Star Bands & Mega Joules
Amendment 1 / 04 April 2011 - editorial changes
T
.
U
Useful Questions for Contracting Documents
10 October 2010 (A) - conditions of use amended
V
Variation Document Template
10 October 2010 (A) - conditions of use amended
W
Waterproof Sealant Local Pratice Interpretation
Amendment 1 / 01 June 2011 - BCA 2011 currency confirmed
X
Y
Z
Zero Lot Wall Metal Fascia Common Practice Solution
Any version proir to Amendment 2 – NOT to be used
Amendment 2 / 02 July 09 - Building Note No 75 reference added
Amendment 3 / 16 May 2010 - formating changes
Amendment 4 / 10 October 2010 - conditions of use amended
Amendment 5 / 30 May 2011 - BCA 2011 currency confirmed