Amendment Register
Current at: 22 February 2010 (B)
How You Know Material Has Been Updated
Why Material Is Amended
The Building Code of Australia (BCA) is amended every year, Australian Standards, Manufacturer Directions and the like change over time, errors in existing material can be discovered, and new issues continually emerge.
Whilst ABLE endeavours to amend material in a timely manner, individuals must familiarise themselves with relevant Codes and Directions to ensure the material they are using is currently applicable.
You Can Suggest Amendments
In a community of practice people learn how to work smarter by exchanging their experiences with others.
Whether you’re a designer or draftsperson, estimator or scheduler, contract administrator, construction manager, supervisor, tradesperson, supplier or contractor you belong to the industry community and are part of a community of individuals that do what you do.
So why not contribute your insights, quick-tips and learnt from experience “watch out for’s”!
How You Know Material Has Been Updated
A "Current at: (DATE)" tag is provided on all material, usually as a header to the material (as shown at the head of this page). This tag identifies when the material was originally published, or last amended, and should be interpreted as follows:
02 Mar 08
A date by itself (2nd March 2008) identifies when the material was first published.
15 Oct 08 (A)
A date (15th October 2008) followed by a bracketed capital letter (A) identifies that it is an amended version of an original publication, and when the amendment was published.
(A), (B), (C)…
A bracketed capital letter is added to the date at each amendment. Capital (A) indicates this is the FIRST amended version of the material, and a capital (C) indicates this is the THIRD amended version of the material, and so on.
What To Look For
If material has a Current at:(DATE) that is prior to the current 1 May BCA amendments date it has not been updated and could be affected by BCA amendments.
If you have downloaded or used material as a reference source, the Current at: (DATE) verifies if the material is still current. An updated Current at:(DATE) indicates that the material has been amended.
Amendments are ONLY listed when material has been amended. When published material is amended it is listed alphabetically and an indicative description of the change(s) is provided. A typical Amendment entry reads as follows:
Framed Roof Tie-Down Common Practice Solution
03 Jan 08 (A) – page 2, construction sketch, editorial corrections made to notations
01 May 09 (B) – page 1, third heading, BCA references updated to reflect BCA 2009 amendments
Amendments
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
Use the alphabet above to search for Amendments.
A
Aircraft Noise in the Vicinity of Perth Airport (Framed Wall Construction) Common Practice Solution
Any date prior to 06 May 09 (A-C) – this material is no longer current.
06 May 09 (D) – minor editorial changes.
As-Built Learning Exchange (page)
15 August 2009 (B) - editorial changes
22 February 2010 (C) - editorial changes
ABLE Workshop Learning Model - (page)
22 February 2010 (A) - editorial amendments
B
BCA 2009 EnergyAssessment_Design-Drafting_In-House (page) and pdf download
22 February 2010 - content restructured - refer to Assessment & Reporting_Design-Drafting_In-House (page)
C
Common Practice Downloads (page)
02 July 09 (A) - Roof Light Common Practice Solution published.
03 July 09 (B) - Glazing Calculator Add-Ons Common Practice Solution published.
15 Aug 09 (C) - page layout restructured
22 February 2010 (D) - editorial amendments, Common Practice Supporters added (AIBS, Wespine, CSR Gyprock), Common Practice Templates added (Contract Work and Work Practice)
Conditions of Use (page)
13 July 09 (A) - amendments made to Privacy Policy statement to include the use of Support Agreement.
22 February 2010 (B) - amendments made to Open Exchange Use definition.
Common Practice (page)
22 February 2010 (A) - editorial content restructured.
Consulting, Investigating and Training (page)
22 February 2010 (A) - page name changed to Technical Services
Compliance & Workmanship Library (page)
22 February 2010 - deleted (refer to Technical Contracting Library)
Common Practice Exchange Agreement (page)
07 March 2010 (A) - changes to wording
D
Design & Drafting Work Practice Description Document Template
07 March 2010 (A) - page layouts restructured.
E
Editor's Notebook (page)
13 July 09 (A) - editorial changes.
22 February 2010 (B) - name changed to Amendment Register
F
G
Glazing Calculator Add-Ons Common Practice Solution
01 May 09 (B) - Excel file worksheet - Air Movement Datasheet amended to include Cyclone Cat D option, Ceiling Insulation Penetration Datasheet added, Roof Light Datasheet added, Compliance Report amended to include BCA2009 amendments and WA Additions (5-Star Plus).
06 October 09 (C) - Excel file worksheet - Ceiling Insulation Penetration Datasheet amended to reflect only one total area (ref: Ceiling Insulation Area Common Practice Interpretation).
09 March 2010 (A) - pdf Cover Sheet - editorial amendments.
H
Home Page
22 February 2010 - editorial amendments
I
Industry Jargon (page)
03 July 09 (A) - page previously called Jargon
22 February (B) - page named changed to Jargon Dictionary
J
K
L
M
N
O
P
Profile - James Bertram (page)
22 February 2010 (A) - editorial amendments.
Product & Material Data (page)
22 February 2010 (A) - editorial changes
Q
R
Regulators & Regulation (page)
22 February 2010 (A) - page content restructured.
S
Site Guide page
30 July 09 (A) - page previously called Site Flowchart, flowchart edited to reflect changes in website structure.
Site Layout page
22 February 2010 (B) - page renamed Site Flowchart, flowchart editied to reflect revised website structure.
Support Agreement (page)
22 February 2010 - deleted (refer to Common Practice Exchange Agreement)
Standard Terms (page)
22 February 2010 (A) - editorial amendments
T
U
V
W
Why Use the Exchange (page)
03 July 09 (A) - page previously called Site Guide
X
Y
Z
Zero Lot Wall Metal Fascia Common Practice Solution
Any date prior to 06 May 09 (A-E) – this material is no longer current.
06 May 09 (F) – page 2, construction sketch, metal fascia notation: amended to include requirement for fascia material to be equivalent to standard eaves fascia material.
02 July 09 (G) - Building Note No 75 reference added.